
Need help?
Talk to an expert

Industrial plant demolition involves coordinated work across structures, machinery, utilities, scrap and site conditions. R Planet assesses manufacturing plants, factories and process areas before defining a controlled demolition or dismantling scope that considers safety, recoverable materials and final site clearance.
A plant closure, relocation or redevelopment can produce mixed material streams. Identifying machinery, ferrous scrap, non-ferrous metal, cables and other recoverable materials early helps create a more organised recovery plan.

The project begins with a site survey, asset and structure review, safety planning and work sequencing. Execution then moves through controlled dismantling or demolition, segregation, recovery and site clearance.
Industrial plant demolition can include selected structures, machinery, process areas, utilities and associated assets within the agreed project scope.
Yes. Machinery and equipment can be assessed as separate assets so that dismantling, recovery or disposal can be planned independently of structural demolition.
Yes. Suitable ferrous and non-ferrous materials recovered during plant demolition can be segregated and routed to appropriate recycling services.
Yes. Plant demolition can support factory closure, relocation, redevelopment and other projects where structures or equipment need to be removed.
Site location, structure type, approximate area, machinery or asset details, access conditions and project objectives help establish the initial scope.

| Metric / Capability | Specification | Regulatory Authority |
|---|---|---|
| Annual Recycling Capacity | 15,000 MT / year | CPCB / GPCB Consented |
| Material Recovery Rate | 98.5%recovery (98.5% Material Recovery Rate) | Zero Landfill Policy |
| Accreditations & Standards | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018 | TUV / Certified |
| Corporate Experience | 10+ years serving 500+ corporate clients | Pan-India Operations |
| Process Method | 5 steps IT asset disposition and data sanitization workflow | NIST 800-88 Compliant |
| ITAD Stage | Methodology | Standard |
|---|---|---|
| Data Destruction | 3-Pass Degaussing & Solid State Drive Shredding | NIST SP 800-88 Rev 1 |
| Hardware Sanitization | DoD 5220.22-M Multi-Pass Overwrite | DoD Certified |
| Chain of Custody | GPS-Tracked Transit & Video Audit Logs | ISO 27001 Aligned |
| Compliance Document | Issuing Framework | Validity |
|---|---|---|
| Certificate of Data Destruction | Serial-Tracked Sanitization | Legally Enforceable |
| Green Recycling Certificate | Zero Landfill Diversion Audit | ESG Reporting |
| Form 6 Hazardous Manifest | CPCB / GPCB Regulatory Tracking | Statutory Audit Ready |
